Line 14: Line 14:
 The next part of the process is that the sending store sends goods to the facility that requested them with the requisition. The goods are sent with a packing list that contains a QR code. When the receiving facility receives the goods they add the consignment to the DHIS2 RTS capture app by scanning the QR code and check what has arrived. When they are happy the receiving facility marks the consignment as complete. The next part of the process is that the sending store sends goods to the facility that requested them with the requisition. The goods are sent with a packing list that contains a QR code. When the receiving facility receives the goods they add the consignment to the DHIS2 RTS capture app by scanning the QR code and check what has arrived. When they are happy the receiving facility marks the consignment as complete.
  
-On a daily schedule mSupply checks the DHIS2 database for complete consignments and retrieves them. mSupply processes the details of the consignment and sends details of the stock supplied for the consignment to the DHIS2 server. The DHIS2 server then sends the updated stock levels to the RTS capture app at the requesting facility.+On a daily schedule mSupply checks the DHIS2 database for complete consignments and retrieves them (at the same time mSupply fetches stock on hand figures for the items in the various facilities. This is not shown in the diagram below). mSupply processes the details of the consignment and sends details of the stock supplied for the consignment to the DHIS2 server. The DHIS2 server then sends the updated stock levels to the RTS capture app at the requesting facility.
  
 This process is illustrated in the following diagram:  This process is illustrated in the following diagram: 
Line 66: Line 66:
   * **STR program ID textbox:** Enter the ID of the DHIS2 STR program used for storing Stock on Hand values into this field. Click on the **Manual pull data** button next to this field to immediately fetch stock on hand figures for facilities, rather than waiting for it do be done on the automatic schedule.   * **STR program ID textbox:** Enter the ID of the DHIS2 STR program used for storing Stock on Hand values into this field. Click on the **Manual pull data** button next to this field to immediately fetch stock on hand figures for facilities, rather than waiting for it do be done on the automatic schedule.
   * **RTS SOH Raw data button:** Click this to display the raw stock on hand data pulled from DHIS2.   * **RTS SOH Raw data button:** Click this to display the raw stock on hand data pulled from DHIS2.
-  * **Data elements table** In this table, select the data elements that you want to pull for each mSupply item.+  * **Data elements table** In this table, select the data elements that you want to pull from DHIS2 for each mSupply item.
     * **Active column:** Check the checkbox for each data element you want to pull for an item. Click on the checkbox to toggle it on and off.     * **Active column:** Check the checkbox for each data element you want to pull for an item. Click on the checkbox to toggle it on and off.
     * **Data element column:** Read only, the name of the element the settings in this line are for.      * **Data element column:** Read only, the name of the element the settings in this line are for. 
-    * **Program data element ID column:** . +    * **Program data element ID column:** The ID of this data element in the Program
-    * **Program stage ID column:** . +    * **Program stage ID column:** The ID of the program stage this data element belongs to
-    * **Attribute ID column:** .+    * **Attribute ID column:** The ID of the attribute this data element has in the program stage.
  
 <WRAP info center round 90%> <WRAP info center round 90%>
Line 81: Line 81:
 If the connection is not successful you will see a red "Authentication failed" message next to the button. Check your settings, edit them as necessary and try again. The connection problem may not be the credentials, it could be something else like the settings for firewalls between mSupply and the DHIS2 database.  If the connection is not successful you will see a red "Authentication failed" message next to the button. Check your settings, edit them as necessary and try again. The connection problem may not be the credentials, it could be something else like the settings for firewalls between mSupply and the DHIS2 database. 
  
-Once configured, a scheduler will run and regularly pull data from and send data to the DHIS2 LMIS instance. If there are any errors these will be saved in the log (see the [[admin:the_log|]] page for details).+Once configured, a scheduler will run every 5 minutes and regularly pull data from and send data to the DHIS2 LMIS instance. If there are any errors these will be saved in the log (see the [[admin:the_log|]] page for details).
  
 \\ \\