Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
items:item_basics:tab_usage [2024/11/01 13:19] – [4.01.04. Items - Usage tab] Gary Willetts | items:item_basics:tab_usage [2025/02/05 15:15] (current) – [Projections] Gary Willetts | ||
---|---|---|---|
Line 1: | Line 1: | ||
==== 4.01.04. Items - Usage tab ==== | ==== 4.01.04. Items - Usage tab ==== | ||
//Back to [[items: | //Back to [[items: | ||
+ | |||
+ | <WRAP center round alert 60%> | ||
+ | **BEWARE!** | ||
The Usage tab allows you to view the historic item usage per month in the store that you are logged in to. This information is very useful for quickly spotting a trend in usage for a particular item. You can also change how mSupply makes forecasting calculations about this item when [[tender_management: | The Usage tab allows you to view the historic item usage per month in the store that you are logged in to. This information is very useful for quickly spotting a trend in usage for a particular item. You can also change how mSupply makes forecasting calculations about this item when [[tender_management: | ||
Line 14: | Line 17: | ||
**Refresh usage button:** This button allows you to update the usage with transactions that were added since you opened the window (this applies to multi-user mode). It also allows you to show the usage with or without build transactions included in the totals, depending on whether or not the **Include builds** checkbox is checked. | **Refresh usage button:** This button allows you to update the usage with transactions that were added since you opened the window (this applies to multi-user mode). It also allows you to show the usage with or without build transactions included in the totals, depending on whether or not the **Include builds** checkbox is checked. | ||
- | **Include builds** checkbox: if checked then mSupply will include confirmed builds (see the [[https:// | + | **Include builds** checkbox: if checked then mSupply will include confirmed builds (see the [[items: |
<WRAP center round info 60%> | <WRAP center round info 60%> | ||
Line 21: | Line 24: | ||
=== Show Graph button === | === Show Graph button === | ||
- | + | Clicking the **Show Graph** button | |
- | Clicking the **Show Graph** button | + | |
{{ : | {{ : | ||
- | One coloured set of bars shows the usage for the current year, another coloured set shows the usage for the previous year (if data is available). | + | The horizontal (X) axis is the period selected on the **Months** drop down list, the vertical |
+ | |||
+ | You can show consumption, | ||
=== Forecasting === | === Forecasting === | ||
+ | This section allows you to set how mSupply calculates future usage of this item when automatically [[tender_management: | ||
+ | |||
+ | * **Use historical Average Monthly Consumption (AMC):** This is the default option, and is the recommended method. This option tells mSupply to just use the calculated current average monthly consumption for future consumption. Whenever this method is used, there is usually a place to tell mSupply how many months of usage data to use when calculating the current AMC. AMC = sum of consumption over X months divided by X. | ||
+ | * **Use historical AMC increased by a factor of X %:** When this option is selected mSupply will still calculate requirements based on the historical AMC calculation above, but the value will be increased by the percentage you enter. | ||
+ | * **Use a fixed, estimated AMC of X items/ | ||
+ | * **Use projection (A or B):** This option tells mSupply to use one of the projections you can enter in the projection section (see below). A projection can have different, fixed values for each month and will be useful if you have calculated the future consumption pattern in other software. If you select this option make sure you enter the projection values! If your use of the consumption figures goes beyond the month you have entered the projection values for then 0 consumption will be used for those months. | ||
+ | |||
+ | With this option, mSupply allows you to maintain an **A** and a **B** projection, and easily swap between them. Of course you must enter projections for this to be of any use! | ||
+ | |||
+ | <WRAP center round tip 60%> | ||
+ | You can imagine that setting these options for many items could be time-consuming. Hoever, mSupply has a function for setting them for many items, see the [[items: | ||
+ | </ | ||
+ | |||
+ | === Projections === | ||
+ | Projections are used when you want to use a fixed, varying AMC that has typically been calculated outside mSupply. You can enter two projections, | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | You can enter projections in a number of ways: | ||
+ | |||
+ | * **Manually entering projections: | ||
+ | |||
+ | <WRAP center round tip 60%> | ||
+ | Press the //Tab// key on the keyboard to move from editing once cell to immediately editing another without having to click again. | ||
+ | </ | ||
+ | |||
+ | * **Copying a projection: | ||
+ | * **Modifying an existing projection: | ||
+ | * Fill in your 2025 column values | ||
+ | * Add a column for 2026 if one doesn' | ||
+ | * Use the **Copy values** button to copy 2025 to 2026 | ||
+ | * Click on the top row of the Shift click the bottom row to highlight all rows in the 2026 column | ||
+ | * Enter '' | ||
+ | |||
+ | **Good things to remember when you're using projections: | ||
+ | - Use the **Add year** button to add another year (for both projection A and projection B). | ||
+ | - Click the **Save projection** button when you want to save any projections (they will all be saved when you click this button). IF YOU DON'T CLICK THIS BUTTON YOUR PROJECTION WILL NOT BE SAVED! There is no auto-save of projections when you leave this window. So, if you want to undo any projection changes leave this window without clicking on the **Save projection** button. | ||
+ | - If you have added extra years, they will not be shown when you first open the Projections window. Just click on the **Add year** button to show the years you want to see. | ||
+ | - If you want to go back to the usage view click on the **Hide Projection** button. | ||
+ | |||
+ | <WRAP center round alert 60%> | ||
+ | If you are using projections for a particular order, you only need to fill in future values for the period to be covered by your ordering. **BUT** leaving future projections at zero could have serious consequences when you come to ordering later... :-/ | ||
+ | </ | ||
- | Refer to the section on [[items: | ||
| // Previous: | | // Previous: |